Second worker rescued from Nepal hydropower tunnel after flood trap
A second trapped worker has been rescued alive from the Trishul 3A hydropower tunnel in Nepal, nine days after floods hit the area. The recovery came during an ongoing rescue operation at the site, where workers had been trapped underground after the flooding. Officials said the rescue followed an earlier recovery reported the same day.
Sponsored
The office of Nepal's energy minister confirmed the second rescue, while army spokesperson Brigadier General Raja Ram Basnet had earlier confirmed that one trapped worker had been brought out alive. A local politician, Shri Ram Neupane, also posted about the second rescue shortly after the first recovery was announced. Images from the site showed the first rescued worker covered in mud and being carried away on a rescuer's shoulder.
A medical team was checking the first rescued worker at the site, according to Brigadier General Basnet. The reports did not immediately give the condition of the second person after being brought out of the tunnel. The operation at Trishul 3A has drawn attention because it involves a flood-related entrapment in a hydropower project, a sector that is important to Nepal's infrastructure and energy supply.
Hydropower is a major part of Nepal's energy system, and tunnel construction sites can become especially dangerous when heavy rain or flooding affects access routes and underground works. In this case, the rescue effort has involved both military personnel and energy ministry officials, underlining the scale of the response. The fact that the workers were still being recovered more than a week after the flooding also points to the difficulty of operating in a damaged tunnel environment.
Sponsored
The Trishul 3A tunnel incident is part of a broader pattern of flood and landslide risks that can disrupt transport and construction projects in Nepal, particularly during periods of intense rainfall. Rescue operations in such settings often depend on coordination between the army, local officials and technical teams at the site. The confirmed survival of two trapped workers will likely be seen as a significant outcome for the emergency response.
What remains unclear is how many people were originally trapped, whether any others are still inside the tunnel, and what caused the flooding to cut off the site. Officials have not yet provided a full account of the rescue timeline or the condition of the second worker after extraction. The next updates are likely to focus on the total number of people affected, the safety of the tunnel, and whether the operation has fully ended.
#Nepal #Trishul3Atunnel #hydropower #rescueoperation #floods


